Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 5 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Weight/sqm
|
8kg/m2--20kg/m2
|
|||
Color
|
Green, Smoky gray, Any color according request
|
|||
Width
|
1-6 m(as per required)
|
|||
Roll Length
|
5m, 10m, 20m(as per required)
|
|||
Package
|
Package
|
|||
Freeze-thaw resistance |
≥75%
|
|||
Flexural strength | ≥1.2 megapascals | |||
Peel strength | ≥95 N/50 mm | |||
Compressive strength | ≥15 MPa |
1. On-site usage environmental conditions: The ambient temperature should be above 3°C.
2. Main construction steps of cement blankets: Flattening, cutting, laying, and hydration.
3. On-site preparation:
- Clean the construction site. The slope surface must be free of loose soil and cavities.
- Compact water-damaged areas, and remove debris and gravel from the slope.
- For areas with cracks or looseness, take necessary repair and stabilization measures.
- The material can be laid vertically or horizontally.
4. Laying sequence:
- Lay the cement blanket from top to bottom, ensuring the laying width fully covers the slope.
- Flattening and compaction: After laying, compact the cement blanket to ensure no cavities exist between it and the slope.
7. During curing period:
During the solidification of cement blankets, measures must be taken to prevent external force impact or human damage, ensuring the blankets can harden smoothly.